Many buildings have energy efficient components; however, they are not often utilized in a synergistic or optimal manner. This results in needless energy consumption at best and opens the door for litigation due to sick building syndrome (for example) at worst. As part of the retro-commissioning process, Cogent Energy performs functional tests to re-establish, or establish for the first time, the optimal functionality of the building's systems. We also develop as-built drawings and sequences of operation to document the final project design. |